Investigation Report
Synthetic Base Mud Loss During BOP Function Test
Read at BSEEOpens the document on bsee.gov
Summary
An investigation examines the loss of 19 barrels of synthetic base mud following slip-joint hydraulic packer failure during a BOP function test. It attributes the packer failure to its hydraulic regulator, distinguishes an unrelated subsea panel fault, and records proposed regulator replacement, low-pressure alarms, packer-status monitoring and additional accumulator volume.