Investigation Report

Crane Shock Loading During Tension-Packer Setting for Well Abandonment

BSEEBureau of Safety and Environmental Enforcement

02-10-2020 17:45 G09524 VR 371 A - Crane

Read at BSEEOpens the document on bsee.gov

Summary

BSEE investigates crane shock loading during tension-packer setting for well abandonment at Vermilion Block 371 platform A. Shear-ring failure reduced the crane load and stretched its boom cable. Findings address repeated shear-ring use, incorrect rating assumptions, an unsuitable job safety analysis and departure from crane operating requirements.

Topics

About This Record
Original title
02-10-2020 17:45 G09524 VR 371 A - Crane
Publisher
Bureau of Safety and Environmental Enforcement
Type
Investigation Report
Date
Unknown
Topic
Mechanical Failure
Activity
Inspection and Maintenance, Pressure Testing, Well Abandonment
Equipment
Crane, Wire Rope
Control
Job Safety Analysis, Operating and Work Procedures, Preventive Maintenance
Sector
Upstream Oil and Gas
Setting
Offshore Installation