Investigation Report

Condensate and Gas Release Beneath Hurricane-Toppled Platform

BSEEBureau of Safety and Environmental Enforcement

08-26-2009 13:11 G03135 VR/267 Pollution - Surface Equipment Failure or Procedures

Read at BSEEOpens the document on bsee.gov

Summary

Investigation of a condensate and gas release from Well C-9 beneath a platform toppled by Hurricane Ike. The report examines a broken master valve, uncertain subsurface barrier failures and a proposed trapped hydraulic-pressure mechanism. It describes limited condensate recovery, valve replacement and cement squeezing to secure the well.

Topics

About This Record
Original title
08-26-2009 13:11 G03135 VR/267 Pollution - Surface Equipment Failure or Procedures
Publisher
Bureau of Safety and Environmental Enforcement
Type
Investigation Report
Date
Unknown
Topic
Environmental Protection, Hydrocarbon Release, Well Control, Well Integrity
Activity
Well Intervention
Equipment
Valve, Wellhead
Control
Emergency Response
Sector
Upstream Oil and Gas
Setting
Subsea
Link
Checked , working
Record
bsee-6a8afeed57 · added 2 October 2026

Report a problem with this record