Investigation Report

Gas Release During Valve Removal on Production Platform

BSEEBureau of Safety and Environmental Enforcement

01-14-2005 11:45 G00911 WC/280 Injury

Read at BSEEOpens the document on bsee.gov

Summary

Investigation of a gas release during valve removal on a production platform. Inadequate isolation allowed pipeline gas to escape through open-ended coalescer piping. The report identifies check-valve malfunction, rushed decisions, deficient procedures, poor communication and fatigue, and recommends lockout and tagout, stop-work processes and coordination of simultaneous operations.

Topics

About This Record
Original title
01-14-2005 11:45 G00911 WC/280 Injury
Publisher
Bureau of Safety and Environmental Enforcement
Type
Investigation Report
Date
Unknown
Topic
Fatigue, Human Factors, Hydrocarbon Release, Mechanical Failure
Activity
Inspection and Maintenance
Equipment
Process Pipework and Pipelines, Valve
Control
Energy and Process Isolation, Lockout and Tagout, Simultaneous Operations Coordination, Stop-Work Authority
Sector
Upstream Oil and Gas
Setting
Offshore Installation
Link
Checked , working
Record
bsee-8f2257907f · added 2 October 2026