Investigation Report

Stored Pressure Released During Potable-Water Tank Dismantling

BSEEBureau of Safety and Environmental Enforcement

07-05-2011 15:30 G02323 EI/360 Required Evacuation - LTA (>3 days) - Other

Read at BSEEOpens the document on bsee.gov

Summary

Investigation of severe facial injuries during dismantling of a potable-water pressure tank. Removing a nozzle released stored bladder pressure, ejecting components and launching the tank. Findings identify failure to depressurise the bladder, unavailable manufacturer instructions, a job safety analysis covering filter changes rather than tank removal, and inadequate supervision.

Topics

About This Record
Original title
07-05-2011 15:30 G02323 EI/360 Required Evacuation - LTA (>3 days) - Other
Publisher
Bureau of Safety and Environmental Enforcement
Type
Investigation Report
Date
Unknown
Topic
Line of Fire, Pressure Systems
Activity
Inspection and Maintenance
Equipment
Hose, Pressure Vessel, Valve
Control
Energy and Process Isolation, Job Safety Analysis, Operating and Work Procedures, Operational Supervision
Sector
Upstream Oil and Gas
Link
Checked , working