Investigation Report
Synthetic-Based Mud Discharged During Transfer to Platform Rig
Read at BSEEOpens the document on bsee.gov
Summary
BSEE investigates an accidental discharge of approximately 517 barrels of synthetic-based mud during transfer to a platform rig. A butterfly-valve gasket failed while a secondary dry-break valve was absent. The report identifies missing written requirements and inspection provisions, and records additional gate valves and planned pre-transfer low-pressure testing.