Investigation Report

Compressor Cylinder Head Fracture and Ejection on Platform

BSEEBureau of Safety and Environmental Enforcement

05-22-2008 15:35 G11455 GB/128 Required Muster - Shutdown from Gas Release

Read at BSEEOpens the document on bsee.gov

Summary

An investigation examines a compressor cylinder-head fracture and ejection at the Enchilada platform, with no personnel injuries. It identifies corrosion-related fatigue cracking and incomplete corrosion removal during an earlier repair, describes shutdown and muster actions, and recommends immediate installation of revised cylinder heads or removal of affected compressors from service.

Topics

About This Record
Original title
05-22-2008 15:35 G11455 GB/128 Required Muster - Shutdown from Gas Release
Publisher
Bureau of Safety and Environmental Enforcement
Type
Investigation Report
Date
Unknown
Topic
Corrosion, Line of Fire, Material Fatigue, Mechanical Failure
Activity
Inspection and Maintenance
Control
Emergency Response
Sector
Upstream Oil and Gas
Setting
Offshore Installation
Link
Checked , working
Record
bsee-f218a64e23 · added 2 October 2026

Report a problem with this record