Safety Alert

Safety Alert 210 - Blowout After Cementing Surface Casing

BSEEBureau of Safety and Environmental EnforcementBSEE Safety Alert 210

Safety Alert 210 - Blowout After Cementing Surface Casing

Read at BSEEOpens the publisher’s page on bsee.gov

Summary

An alert describes gas flow after surface casing cementing, increasing annulus pressure and subsequent gas emergence from adjacent wells. The platform was safely evacuated. Investigators identified probable cement-density regression and/or channel formation associated with delayed pumping. MMS recommends prompt cement pumping after landing casing and circulating at least one casing volume.

Topics

About This Record
Publisher
Bureau of Safety and Environmental Enforcement
Type
Safety Alert
Reference
BSEE Safety Alert 210
Date
8 January 2003 (added from another catalogue record)
Topic
Well Control, Well Integrity
Activity
Drilling
Control
Operating and Work Procedures
Sector
Upstream Oil and Gas
Link
Checked , working
Record
bsee-safety-alert-210 · added 2 September 2026

Report a problem with this record