Guidance

Well Workover

BSEEBureau of Safety and Environmental Enforcement

Well Workover

Read at BSEEOpens the document on bsee.gov

Summary

This regulatory inspection guide presents compliance questions for oil and gas well-workover operations. It covers prior approval, well-control fluid replenishment and measurement, crown-block safety checks, mud-pit level warnings, tubing and wellhead requirements, wireline leakage prevention, and pressure testing of newly installed lubricators against expected shut-in surface pressure.

Topics

About This Record
Publisher
Bureau of Safety and Environmental Enforcement
Type
Guidance
Date
February 2026 (taken from the file name)
Topic
Loss of Containment, Pressure Systems, Regulation and Legislation, Well Control
Activity
Pressure Testing, Well Intervention
Equipment
Wellhead
Control
Functional Testing, Permit to Work
Sector
Upstream Oil and Gas
Link
Checked , working
Record
bsee-w-pincs-operators-version-feb-2026 · added 1 September 2026

Report a problem with this record