Summary

A pneumatic pipe test pressurised a connected tank through a leaking block valve, causing bottom failure and lifting the tank onto the plant. The bulletin recommends positive isolation, adequate pressure relief, reviewing non-routine operations and keeping workers clear. Where possible, it favours hydrostatic testing because less energy can be released.

Topics

About This Record
Publisher
Center for Chemical Process Safety, AIChE
Type
Digest
Reference
Process Safety Beacon October 2007
Date
October 2007 (taken from the file name)
Topic
Pressure Systems, Process Safety
Activity
Pressure Testing
Equipment
Process Pipework and Pipelines, Storage Tanks, Valve
Control
Exclusion Zones, Energy and Process Isolation, Pressure Relief, Risk Assessment