What happens when the lights go out? — Process Safety Beacon, January 2012

CCPSCenter for Chemical Process Safety, AIChEProcess Safety Beacon January 2012

What happens when the lights go out? — Process Safety Beacon, January 2012

Read at CCPSOpens the publisher’s page on ccps.aiche.org

Summary

A mistaken circuit-breaker operation briefly interrupted PLC power, leaving a process running with partial controls and overloading a vent scrubber with toxic material. The bulletin emphasises assessing combined utility-failure effects, understanding device failure states, clearly labelling electrical controls, verifying operation and practising emergency procedures.

Topics

About This Record
Publisher
Center for Chemical Process Safety, AIChE
Type
Digest
Reference
Process Safety Beacon January 2012
Date
January 2012 (taken from the file name)
Topic
Human Factors, Loss of Containment, Process Safety
Activity
Electrical Work
Equipment
Switchgear
Control
Emergency Response, Functional Testing, Operating and Work Procedures, Risk Assessment
Link
Checked , could not be checked
Record
ccps-beacon-2012-01 · added 1 September 2026

Report a problem with this record