Summary

A contractor suffered acid burns when residual hydrogen fluoride escaped during flange maintenance after incomplete piping decontamination. The bulletin examines missing drawings, vacuum and nitrogen purging, and reduced protective clothing. It stresses field verification of isolations, clearing trapped material and retaining full protection until piping is proven free of hazards.

Topics

About This Record
Publisher
Center for Chemical Process Safety, AIChE
Type
Digest
Reference
Process Safety Beacon March 2026
Date
March 2026 (taken from the file name)
Topic
Hazardous Substances, Loss of Containment
Activity
Inspection and Maintenance
Equipment
Personal Protective Equipment, Process Pipework and Pipelines
Control
Energy and Process Isolation, Lockout and Tagout, Operating and Work Procedures