Investigation Report

Macondo Volume 2 Final Report

CSBU.S. Chemical Safety and Hazard Investigation Board

Macondo Volume 2 Final Report

Publisher PageOpens the publisher’s page on csb.gov

Summary

Volume 2 examines the Deepwater Horizon blowout preventer’s failure to seal the Macondo well, including off-centre drillpipe buckling, miswired solenoid valves and emergency-system assurance gaps. It uses forensic testing and modelling to assess barrier performance, comparing regulatory approaches and recommending lifecycle management and independent verification of safety-critical elements.

Topics

About This Record
Publisher
U.S. Chemical Safety and Hazard Investigation Board
Type
Investigation Report
Date
5 June 2014 (added from another catalogue record)
Topic
Barrier Management, Functional Safety, Mechanical Failure, Regulation and Legislation, Well Control
Activity
Drilling, Inspection and Maintenance, Well Abandonment
Equipment
Blowout Preventer, Valve
Control
Functional Testing, Independent Audit and Verification, Preventive Maintenance, Risk Assessment
Sector
Upstream Oil and Gas
Setting
Offshore Installation, Subsea
Record
csb-macondo-volume-2-final-report · added 1 September 2026

Report a problem with this record