Guidance
The safe approach, set-up and departure of jack-up rigs to fixed installations (REV 1)
The safe approach, set-up and departure of jack-up rigs to fixed installations (REV 1)
- HSE
- Guidance
- Offshore Information Sheet 1/2020
- Control of WorkMarine Operations
- Human factorsHydrocarbon releaseRegulation and legislationRisk managementVessel collision
- Marine operations
- Process pipework and pipelines
- Energy and process isolationManagement of changeRisk assessmentSafety-case assurance
- Upstream oil and gas
- Offshore installation
Summary
Guidance for duty holders managing jack-up approach, positioning and departure beside fixed offshore installations. It examines collision and hydrocarbon-release risks, pipeline protection, human factors and personnel limits. Site-specific ALARP demonstrations underpin decisions on production shutdown, depressurisation and venting, with live approaches requiring justification of changed circumstances.
Classifications: Human factors; human performance; ergonomics.
Classifications: Hydrocarbon release; hydrocarbon leak; oil and gas release.
Classifications: Regulation and legislation; safety legislation; regulatory requirements.
Classifications: Risk management; risk evaluation.
Classifications: Vessel collision; ship collision; marine allision.
Classifications: Marine operations; maritime operations.
Classifications: Process pipework and pipelines; process piping.
Classifications: Energy and process isolation; isolation; energy isolation.
Classifications: Management of change; MOC; change management.
Classifications: Risk assessment; hazard assessment.
Classifications: Safety-case assurance.
Classifications: Upstream oil and gas; oil and gas extraction; upstream petroleum.
Classifications: Offshore installation; offshore platform; offshore rig.
Summary
Guidance covers safe jack-up rig movements alongside fixed offshore installations.
Offshore Information Sheet 1/2020. Themes: control of work, marine operations.