Guidance

Offshore installation moorings

HSEUK Health and Safety ExecutiveOffshore Information Sheet 4/2013

Offshore installation moorings

Read at HSEOpens the document on webarchive.nationalarchives.gov.uk

Summary

This information sheet explains offshore mooring requirements for permanently moored installations and mobile units. It addresses design standards, weather robustness, thruster assistance, inspection criteria, tension and position monitoring, line-break response and failure reporting. Location-specific analyses and anchor verification are discussed alongside safety-case duties and verification arrangements.

Topics

About This Record
Publisher
UK Health and Safety Executive
Type
Guidance
Reference
Offshore Information Sheet 4/2013
Date
2013
Topic
Loss of Station Keeping, Regulation and Legislation, Structural and Asset Integrity
Activity
Inspection and Maintenance, Mooring Operations
Equipment
Mooring Lines
Control
Competence and Training, Emergency Response, Independent Audit and Verification, Preventive Maintenance
Sector
Upstream Oil and Gas
Setting
Offshore Installation
Link
Not yet checked
Publisher page
hse.gov.uk
Record
hse-is4-2013 · added 3 September 2026

Report a problem with this record