Guidance

OCE5 - Insulation – installation

HSEUK Health and Safety Executive

OCE5 - Insulation – installation

Read at HSEOpens the document on hse.gov.uk

Summary

Guidance for removing mineral-fibre insulation on offshore installations addresses dust exposure and skin irritation. It describes restricted access, wet removal, Class H vacuum cleaning, particle respirators and disposable protective clothing, alongside equipment examinations, waste handling, decontamination, dermatitis surveillance and worker training. Asbestos and refractory ceramic fibre work are excluded.

Topics

About This Record
Publisher
UK Health and Safety Executive
Type
Guidance
Date
March 2011 (added from another catalogue record)
Topic
Hazardous Substances, Respiratory Hazards
Equipment
Personal Protective Equipment, Respirator
Control
Competence and Training, Exclusion Zones, Medical Surveillance, Operational Supervision
Sector
Upstream Oil and Gas
Setting
Offshore Installation
Link
Checked , working
Record
hse-oce5 · added 1 September 2026

Report a problem with this record