Safety Alert

Suction Tank Confined Space Hazard

IADCInternational Association of Drilling ContractorsIADC Alert 05-27

Suction Tank Confined Space Hazard

Read at IADCOpens the publisher’s page on iadc.org

Summary

Two employees entered a rig mud pump suction tank for cleaning after permit completion and review of a lock-out JSA. An overlooked pressure-relief discharge connection led into the compartment from an unisolated pump whose bleed-off line remained unopened. A supervisor recognised the danger and removed the employees before an incident occurred.

Topics

About This Record
Publisher
International Association of Drilling Contractors
Type
Safety Alert
Reference
IADC Alert 05-27
Date
2 July 2005
Topic
Confined Space Hazards, Pressure Systems
Activity
Confined Space Entry
Equipment
Process Pipework and Pipelines, Pumps, Storage Tanks
Control
Energy and Process Isolation, Job Safety Analysis, Lockout and Tagout, Permit to Work
Sector
Upstream Oil and Gas
Link
Checked , working
Record
iadc-alert-05-27 · added 3 September 2026

Report a problem with this record