Safety Flash
Near miss: potential dropped objects on temporary buoy modules (TBMs)
Read at IMCAOpens the publisher’s page on imca-int.com
Summary
Two near misses involved loose objects discovered on temporary buoyancy modules retrieved to deck during tension leg platform installation. One concerned unrecovered subsea lamps and missing subcontractor notification; the other involved an inadequately lashed retaining pin removed by an ROV. Actions addressed material recovery procedures and reinforced stop-work authority.