Safety Flash
Well drilled in the wrong place breaches railway tunnel
Read at IMCAOpens the publisher’s page on imca-int.com
Summary
An exploratory well drilled during a Paris underground railway extension breached an existing tunnel, admitting groundwater and mud and closing the line for three days. No injuries were reported. The flash identifies missing client approval and surveyor validation, and recommends obtaining professional surveying advice for positioning operations.