An exploratory well drilled during a Paris underground railway extension breached an existing tunnel, admitting groundwater and mud and closing the line for three days. No injuries were reported. The flash identifies missing client approval and surveyor validation, and recommends obtaining professional surveying advice for positioning operations.

Topics

About This Record
Publisher
International Marine Contractors Association
Type
Safety Flash
Reference
IMCA SF 15/19
Date
1 July 2019
Topic
Structural and Asset Integrity
Activity
Drilling
Control
Control of Work
Sector
Construction
Link
Checked , working
Record
imca-sf-15-19-well-drilled-in-the-wrong-place-breaches-railway-tunnel · added 1 September 2026

Report a problem with this record