Safety Flash
UK HSE: Workers injured by unplanned release of mud slurry
Read at IMCAOpens the publisher’s page on imca-int.com
Summary
Three contractors suffered multiple fractures when approximately 39 cubic metres of diluted slurry escaped during recirculation pump removal for maintenance. A blocked drain had prevented discharge of pressurised contents before work began. The flash reports inadequate risk assessment and failure to implement a safe system of work.