Safety Flash

Near miss – Diving operations while alongside

IMCAInternational Marine Contractors AssociationIMCA SF 23/19

Near miss – Diving operations while alongside

Read at IMCAOpens the publisher’s page on imca-int.com

Summary

A main engine started while a diver cleared bow-thruster debris in a dockyard; the bridge immediately shut it down and the diver escaped unhurt. The flash identifies failures in communication, permits, lockout/tagout and risk assessment, and recommends physical isolation and verified control-of-work arrangements before diving.

Topics

About This Record
Publisher
International Marine Contractors Association
Type
Safety Flash
Reference
IMCA SF 23/19
Date
30 September 2019
Activity
Diving Operations, Inspection and Maintenance
Equipment
Rotating Machinery
Control
Control of Work, Energy and Process Isolation, Lockout and Tagout, Permit to Work
Sector
Marine Industry
Setting
Port and Quayside, Subsea
Link
Checked , working
Record
imca-sf-23-19-near-miss-diving-operations-while-alongside · added 1 September 2026

Report a problem with this record