Load exceeding safe working load (SWL) leads to overstressed and damaged rigging

IMCAInternational Marine Contractors AssociationIMCA SF 32/17

Load exceeding safe working load (SWL) leads to overstressed and damaged rigging

Read at IMCAOpens the publisher’s page on imca-int.com

Summary

During pipeline decommissioning, a crane-suspended shear tool pulled downwards as its jaws closed, overloading and deforming the rigging. A nearby diver could have been harmed. The flash identifies planning and communication shortcomings and highlights tool placement, available slack, communicating rigging capacity and reviewing rigging drawings.

Topics

About This Record
Publisher
International Marine Contractors Association
Type
Safety Flash
Reference
IMCA SF 32/17
Date
21 December 2017
Topic
Line of Fire, Mechanical Failure
Activity
Decommissioning, Lifting Operations, Rigging
Equipment
Crane, Lifting Accessories
Control
Lifting Plan, Safety Communication
Setting
Subsea
Link
Checked , working
Record
imca-sf-32-17-load-exceeding-safe-working-load-swl-leads-to-overstressed-and-damaged-rigging · added 1 September 2026

Report a problem with this record