Safety Flash
Load exceeding safe working load (SWL) leads to overstressed and damaged rigging
Read at IMCAOpens the publisher’s page on imca-int.com
Summary
During pipeline decommissioning, a crane-suspended shear tool pulled downwards as its jaws closed, overloading and deforming the rigging. A nearby diver could have been harmed. The flash identifies planning and communication shortcomings and highlights tool placement, available slack, communicating rigging capacity and reviewing rigging drawings.