Investigation Report

Pressure Release at Flange During Well Hot Bolting

BSEEBureau of Safety and Environmental Enforcement

06-06-2011 13:55 G21790 GC/338 Required Evacuation - LTA (>3 days) - Other

Read at BSEEOpens the document on bsee.gov

Summary

An investigation describes a facial injury during well hot bolting while piping pressure was being equalised. Pressure of up to 5000 psi escaped at a flange after multiple bolts were removed. Findings identify misunderstanding of the task, an unsigned job safety analysis, lone working without control-room notification and failure to de-energise equipment.

Topics

About This Record
Original title
06-06-2011 13:55 G21790 GC/338 Required Evacuation - LTA (>3 days) - Other
Publisher
Bureau of Safety and Environmental Enforcement
Type
Investigation Report
Date
Unknown
Topic
Human Factors, Line of Fire, Pressure Systems
Activity
Inspection and Maintenance
Equipment
Process Pipework and Pipelines
Control
Job Safety Analysis
Sector
Upstream Oil and Gas
Setting
Offshore Installation
Link
Checked , working
Record
bsee-255996055f · added 2 October 2026

Report a problem with this record