Investigation Report

Zinc Bromide Completion Fluid Discharge During Acid Job

BSEEBureau of Safety and Environmental Enforcement

12-03-2009 20:00 G31694 GC/97 Pollution

Read at BSEEOpens the document on bsee.gov

Summary

An investigation examines the discharge of 230 bbls of 15.7 ppg zinc bromide completion fluid during an acid job between a frac boat and rig. An open gumbo-box drain valve diverted returns overboard. Findings address valve alignment, communication and monitoring failures; subsequent measures included lockout/tagout, training and radios.

Topics

About This Record
Original title
12-03-2009 20:00 G31694 GC/97 Pollution
Publisher
Bureau of Safety and Environmental Enforcement
Type
Investigation Report
Date
Unknown
Topic
Environmental Protection, Loss of Containment
Activity
Fluid Transfer, Well Intervention
Equipment
Process Pipework and Pipelines, Valve
Control
Competence and Training, Lockout and Tagout, Operating and Work Procedures, Safety Communication
Sector
Upstream Oil and Gas
Setting
Marine Waters, Offshore Installation