Investigation Report
Hydraulic Fluid Discharge Following BOP Control-Computer Switch
Read at BSEEOpens the document on bsee.gov
Summary
An investigation records hydraulic-fluid pollution following a BOP control-computer switch that generated a spurious release signal and activated riser-tensioner valves. Venting went unnoticed for seven hours; 250 gallons entered the sea. The LMRP remained connected. Measures included temporary recoil-system isolation, proposed closed-loop recovery, software corrections and requested alarm-priority changes.