Summary

Investigation of an approximately 150-barrel synthetic-based mud discharge from Noble Driller into the Gulf of Mexico during preparations for completion fluids. A leaking mud-pit dump valve and open master valves provided the release path. The report identifies an unattended pit and ineffective volume-alarm settings as contributing factors.

Topics

About This Record
Original title
09-24-2014 06:00 G16698 GC 155 Pollution / Inadvertent Discharge of SBM / Equipment Failure / Human Error
Publisher
Bureau of Safety and Environmental Enforcement
Type
Investigation Report
Date
Unknown
Topic
Environmental Protection, Human Factors, Loss of Containment, Mechanical Failure
Activity
Fluid Transfer
Equipment
Storage Tanks, Valve
Control
Alarm Management
Sector
Upstream Oil and Gas
Setting
Marine Waters, Vessel