Investigation Report

Gas Entered Platform Fresh-Water Supply During Well Washing

BSEEBureau of Safety and Environmental Enforcement

05-23-2008 02:00 G02445 VK/900 LWC - Surface - Required Muster

Read at BSEEOpens the document on bsee.gov

Summary

Investigation of gas entering a platform’s fresh-water supply during well washing, prompting suspension of production and crew muster. The report identifies a connected high-pressure water pump and leaking regulator, describes isolation and check-valve testing and replacement, and records provision of an independent water source for the pump.

Topics

About This Record
Original title
05-23-2008 02:00 G02445 VK/900 LWC - Surface - Required Muster
Publisher
Bureau of Safety and Environmental Enforcement
Type
Investigation Report
Date
Unknown
Topic
Loss of Containment, Mechanical Failure, Potable-Water Hygiene
Activity
Well Intervention
Equipment
Pumps, Valve
Control
Emergency Response, Functional Testing, Energy and Process Isolation, Safety Communication