Summary
An investigation examines a gas pipeline riser rupture at WC-45-A during production shutdown. Rising pressure and external corrosion were identified as causes. Findings address inadequate maintenance, inspection and reactivation testing, delayed valve closure and deficient tracking records. Two operators evacuated by boat; ultrasonic testing confirmed extensive metal loss.
Classifications: Corrosion; corrosion damage.
Classifications: Hydrocarbon release; hydrocarbon leak; oil and gas release.
Classifications: Pressure systems; stored pressure; pressurised systems; pressurized systems.
Classifications: Structural and asset integrity; asset integrity; structural integrity.
Classifications: Inspection and maintenance; asset inspection; equipment maintenance.
Classifications: Pressure testing; hydrostatic testing; pneumatic testing.
Classifications: Process pipework and pipelines; process piping.
Classifications: Valve; valves.
Classifications: Evacuation, escape and rescue; EER; escape and rescue.
Classifications: Functional testing; function test.
Classifications: Non-destructive testing; NDT; non-destructive examination; NDE.
Classifications: Preventive maintenance; preventative maintenance; planned maintenance.
Classifications: Upstream oil and gas; oil and gas extraction; upstream petroleum.
Classifications: Offshore installation; offshore platform; offshore rig.