Investigation Report

Uncontrolled Crane Boom Movement During Tote-Tank Lifting

BSEEBureau of Safety and Environmental Enforcement

02-15-2006 14:00 G03171 PL/13 Crane Incident

Read at BSEEOpens the document on bsee.gov

Summary

An investigation examines uncontrolled crane boom movement during tote-tank lifting aboard the Superior Champion. It identifies adjustment beyond safe operating limits as the probable cause and discusses possible hydraulic-control problems, crane placement and an earlier event not reported to office staff. Recommendations address communication, pressure relief and engine kill-switch accessibility.

Topics

About This Record
Original title
02-15-2006 14:00 G03171 PL/13 Crane Incident
Publisher
Bureau of Safety and Environmental Enforcement
Type
Investigation Report
Date
Unknown
Topic
Human Factors, Mechanical Failure
Activity
Inspection and Maintenance, Lifting Operations
Equipment
Crane
Control
Human-Centred Design, Pressure Relief, Safety Communication
Sector
Marine Industry, Upstream Oil and Gas
Setting
Vessel
Link
Checked , working
Record
bsee-7134a87fca · added 2 October 2026

Report a problem with this record