Investigation Report

Blanket Gas Pipework Leak Discovered During Platform Integrity Inspection

BSEEBureau of Safety and Environmental Enforcement

09-19-2017 16:00 G11445 GB 128 Gas Release / Required Muster

Read at BSEEOpens the document on bsee.gov

Summary

An annual integrity inspection on the Enchilada platform revealed a gas leak when an inspector lifted blanket-gas pipework from an I-beam. The investigation attributed the pinhole to corrosion at the support. A personal monitor detected gas, but the facility system did not; shutdown and muster were initiated manually. No injuries or pollution occurred.

Topics

About This Record
Original title
09-19-2017 16:00 G11445 GB 128 Gas Release / Required Muster
Publisher
Bureau of Safety and Environmental Enforcement
Type
Investigation Report
Date
Unknown
Topic
Corrosion, Loss of Containment, Pressure Systems
Activity
Inspection and Maintenance
Equipment
Gas Detector, Process Pipework and Pipelines
Control
Emergency Response
Sector
Upstream Oil and Gas