Summary

An investigation records a choke-line disconnection during mud flushing on Development Driller II. An incorrectly installed gooseneck connection parted despite repeated pressure tests, releasing a calculated 97 barrels of synthetic oil-based mud overboard. Systems were secured, the gooseneck replaced and a safety line fitted to prevent further overboard discharge.

Topics

About This Record
Original title
11-10-2009 13:57 G15607 GC/743 Pollution
Publisher
Bureau of Safety and Environmental Enforcement
Type
Investigation Report
Date
Unknown
Topic
Environmental Protection, Hydrocarbon Release, Loss of Containment, Mechanical Failure
Activity
Fluid Transfer, Inspection and Maintenance
Equipment
Process Pipework and Pipelines
Control
Energy and Process Isolation, Pollution Reporting, Positive Retention and Reliable Securing
Sector
Upstream Oil and Gas
Setting
Marine Waters