Investigation Report

Synthetic-Based Mud Discharge During Liner Cementing

BSEEBureau of Safety and Environmental Enforcement

02-28-2005 23:30 G07963 MC/807 Pollution

Read at BSEEOpens the document on bsee.gov

Summary

An investigation examines an offshore discharge during liner cementing. Misreading an isolation-ball pressure increase led to early termination of cement displacement and circulation of cement to surface. Deliberate disposal of contaminated fluid released approximately 204 barrels of synthetic-based mud. Recommendations address contingency arrangements and clarification of interface discharge limits and reporting.

Topics

About This Record
Original title
02-28-2005 23:30 G07963 MC/807 Pollution
Publisher
Bureau of Safety and Environmental Enforcement
Type
Investigation Report
Date
Unknown
Topic
Environmental Protection, Human Factors, Hydrocarbon Release
Activity
Drilling
Equipment
Process Pipework and Pipelines
Control
Operating and Work Procedures, Pollution Reporting
Sector
Upstream Oil and Gas
Setting
Marine Waters
Link
Checked , working
Record
bsee-9b6ae7db41 · added 2 October 2026

Report a problem with this record