Investigation Report
Nitrogen Cylinder Ruptures Propelled Equipment Across Deck and Overboard
Read at BSEEOpens the document on bsee.gov
Summary
BSEE investigates nitrogen cylinder ruptures on Main Pass 42 Delta platform. A corroded cylinder ruptured within an interconnected rack, tearing tubing and valves from other cylinders and propelling them across the deck and overboard. No injuries occurred. The report identifies overdue inspections and the absence of a routine inspection programme.