Investigation Report

Unintended Emergency Disconnect Releases Completion Fluid During BOP Control Troubleshooting

BSEEBureau of Safety and Environmental Enforcement

02-19-2012 17:00 G14205 EB/602 Pollution- Other

Read at BSEEOpens the document on bsee.gov

Summary

An investigation examines an unintended emergency disconnect on ENSCO 8500 that released 849 barrels of calcium chloride completion fluid to sea. Troubleshooting live BOP control-panel wiring caused a relay voltage drop. Findings identify absent work authorisation, task risk assessment and procedures, alongside failures to communicate and follow an engineering bulletin.

Topics

About This Record
Original title
02-19-2012 17:00 G14205 EB/602 Pollution- Other
Publisher
Bureau of Safety and Environmental Enforcement
Type
Investigation Report
Date
Unknown
Topic
Environmental Protection, Functional Safety, Loss of Containment
Activity
Electrical Work
Equipment
Blowout Preventer, Operator Displays and Control Interfaces
Control
Job Safety Analysis, Operating and Work Procedures, Permit to Work, Safety Communication
Sector
Upstream Oil and Gas
Setting
Offshore Installation