Investigation Report
Dynamic Positioning Malfunction with Riser Disconnection and Brine Release During Well Completion
Read at BSEEOpens the document on bsee.gov
Summary
Investigation of a dynamic positioning malfunction during well completion and console maintenance. Corrupted control data and subsequent troubleshooting caused the rig to leave its watch circle, triggering riser disconnection and releasing approximately 550 barrels of sodium bromide brine. Planned changes address alarms, command timing, console verification and simulator training.