Investigation Report

Equinor – Sleipner B – investigation of fire

HavtilNorwegian Ocean Industry Authority

Equinor – Sleipner B – investigation of fire

Read at HavtilOpens the document on havtil.no

Summary

This revised investigation examines the Sleipner B variable speed drive fire on 22 October 2024. The initiating cause remains uncertain. It analyses electrical supply dependencies, unavailable firewater, smoke containment, ventilation, maintenance and emergency response, identifying seven non-conformities. Material damage and prolonged production shutdown occurred, without reported injuries or discharges to sea.

Topics

About This Record
Publisher
Norwegian Ocean Industry Authority
Type
Investigation Report
Date
Unknown
Topic
Barrier Management, Electrical Safety, Fire, Functional Safety
Activity
Inspection and Maintenance
Equipment
Pumps, Switchgear
Control
Competence and Training, Emergency Response, Fire Protection, Ventilation
Sector
Upstream Oil and Gas
Setting
Offshore Installation
Link
Checked , working
Record
havtil-21b30ed876 · added 2 October 2026

Report a problem with this record