Investigation Report
Discharge-Hose Fire During Drilling-Fluid Heater Commissioning
Read at BSEEOpens the document on bsee.gov
Summary
Investigates a discharge-hose fire during commissioning of a drilling-fluid heater aboard Deepwater Asgard. Incorrect junction-box connections and twisted wires produced false temperature signals, preventing heater shutdown. The report examines wiring tests, inadequate commissioning procedures and planned equipment and procedural changes. Portable extinguishers controlled the fire; no injuries were reported.