Investigation Report
Equinor/Floatel International - Floatel Endurance - investigation of unintentional gangway disconnection
Read at HavtilOpens the document on havtil.no
Summary
Investigates Floatel Endurance’s loss of position and automatic gangway lift at Martin Linge on 29 February 2020. One person returned safely without physical injury. The report examines wave loading, dynamic positioning limitations, deficient operating limits, conflicting safety instructions and delayed personnel accounting, alongside helicopter transfers following disconnection.