IMCAInternational Marine Contractors AssociationIMCA SF 02/24

MSF: LTI – Engineer scalded

Read at IMCAOpens the publisher’s page on imca-int.com

Summary

An engineer aboard a platform supply vessel suffered scalding burns when a cooling-water compensator burst during refilling after repair. The flash discusses sudden pressure increase, unsuitable temperature rating, likely material degradation and potentially inadequate pressure relief. Corrective measures address compensator suitability, installation checks, cooling before refilling and planned inspection and maintenance.

Topics

About This Record
Publisher
International Marine Contractors Association
Type
Safety Flash
Reference
IMCA SF 02/24
Date
22 January 2024
Topic
Mechanical Failure, Pressure Systems
Activity
Inspection and Maintenance
Equipment
Valve
Control
Operating and Work Procedures, Pressure Relief, Preventive Maintenance
Sector
Marine Industry
Setting
Vessel