Safety Flash

UK HSE: Offshore crane boom hoist failures

IMCAInternational Marine Contractors AssociationIMCA SF 04/22

UK HSE: Offshore crane boom hoist failures

Read at IMCAOpens the publisher’s page on imca-int.com

Summary

This flash summarises two offshore crane incidents in which boom hoist ropes left sheaves, sustained undetected damage and failed during lifting. Booms and loads fell, with no injuries reported. It discusses possible slack-rope and installation-twist mechanisms, and recommends controlled operation, manufacturer-guided stowage, retention-bar inspection and rope-seating checks.

Topics

About This Record
Publisher
International Marine Contractors Association
Type
Safety Flash
Reference
IMCA SF 04/22
Date
10 February 2022
Topic
Dropped Objects, Mechanical Failure
Activity
Inspection and Maintenance, Lifting Operations
Equipment
Crane, Wire Rope
Control
Operating and Work Procedures, Positive Retention and Reliable Securing, Pre-Use Checks
Setting
Offshore Installation
Link
Checked , working
Record
imca-sf-04-22-uk-hse-offshore-crane-boom-hoist-failures · added 1 September 2026

Report a problem with this record