Safety Flash

Failure of lifeboat lowering mechanism

IMCAInternational Marine Contractors AssociationIMCA SF 05/02

Failure of lifeboat lowering mechanism

Read at IMCAOpens the publisher’s page on imca-int.com

Summary

During coxswain training, a lifeboat’s bow release hook opened on reaching the water, releasing the forward fall while the aft fall stayed secured. Loose operating cable end fittings left the cam unrestrained. The company recommended manufacturer inspections, planned maintenance, pre-launch visual checks and test launches whenever the vessel is in port.

Topics

About This Record
Publisher
International Marine Contractors Association
Type
Safety Flash
Reference
IMCA SF 05/02
Date
1 July 2002
Topic
Mechanical Failure
Activity
Inspection and Maintenance, Lifting Operations
Equipment
Lifeboat, Lifting Accessories
Control
Functional Testing, Pre-Use Checks, Preventive Maintenance
Sector
Marine Industry
Link
Checked , working
Record
imca-sf-05-02-failure-of-lifeboat-lowering-mechanism · added 1 September 2026

Report a problem with this record