Safety Flash

Near miss: Failure of work procedures during hot work at height

IMCAInternational Marine Contractors AssociationIMCA SF 09/20

Near miss: Failure of work procedures during hot work at height

Read at IMCAOpens the publisher’s page on imca-int.com

Summary

A vessel Master spotted welding beside an unsecured edge during installation of access support plates in the port-side davit area. Despite a permit, risk assessment and toolbox talk, height hazards remained unaddressed. Welding was stopped and extra fall prevention installed; the account highlights inadequate assessment and acceptance of a supposedly quick task.

Topics

About This Record
Publisher
International Marine Contractors Association
Type
Safety Flash
Reference
IMCA SF 09/20
Date
6 March 2020
Topic
Falls from Height, Human Factors, Risk Management
Activity
Hot Work, Working at Height
Control
Fall Prevention, Permit to Work, Risk Assessment, Stop-Work Authority
Sector
Marine Industry
Setting
Vessel
Link
Checked , working
Record
imca-sf-09-20-near-miss-failure-of-work-procedures-during-hot-work-at-height · added 1 September 2026

Report a problem with this record