Safety Flash

Near-miss involving diver’s neck dam

IMCAInternational Marine Contractors AssociationIMCA SF 12/03

Near-miss involving diver’s neck dam

Read at IMCAOpens the publisher’s page on imca-int.com

Summary

A saturation diver discovered missing and loose neck-dam retaining screws during preparations to enter the bell. Inspection identified stripped threads and fitting contrary to company procedures. The flash describes maintenance authorisation and access controls, while clarifying that the fitting method was not necessarily incorrect under other companies’ or manufacturers’ procedures.

Topics

About This Record
Publisher
International Marine Contractors Association
Type
Safety Flash
Reference
IMCA SF 12/03
Date
2 September 2003
Topic
Mechanical Failure
Activity
Inspection and Maintenance, Saturation Diving
Equipment
Personal Protective Equipment
Control
Competence and Training, Control of Work, Operating and Work Procedures, Safety Communication
Link
Checked , working
Record
imca-sf-12-03-near-miss-involving-diver-s-neck-dam · added 1 September 2026

Report a problem with this record