Safety Flash

Thermal tunnel buoyancy when deployed subsea

IMCAInternational Marine Contractors AssociationIMCA SF 12/15

Thermal tunnel buoyancy when deployed subsea

Read at IMCAOpens the publisher’s page on imca-int.com

Summary

A thermal tunnel failed to sink during subsea construction because the manufacturer’s buoyancy calculations were incorrect. Additional weight enabled installation beneath a concrete mattress. The flash discusses wet testing, independent buoyancy verification and management of change, while identifying a potential recurrence if the mattress were removed and weight fixings had deteriorated.

Topics

About This Record
Publisher
International Marine Contractors Association
Type
Safety Flash
Reference
IMCA SF 12/15
Date
28 August 2015
Activity
Marine Operations
Control
Functional Testing, Independent Audit and Verification, Management of Change
Sector
Marine Industry
Setting
Subsea
Link
Checked , working
Record
imca-sf-12-15-thermal-tunnel-buoyancy-when-deployed-subsea · added 1 September 2026

Report a problem with this record