Summary
A thermal tunnel failed to sink during subsea construction because the manufacturer’s buoyancy calculations were incorrect. Additional weight enabled installation beneath a concrete mattress. The flash discusses wet testing, independent buoyancy verification and management of change, while identifying a potential recurrence if the mattress were removed and weight fixings had deteriorated.
Classifications: Marine operations; maritime operations.
Classifications: Functional testing; function test.
Classifications: Independent audit and verification.
Classifications: Management of change; MOC; change management.
Classifications: Marine industry; shipping industry; maritime sector.
Classifications: Subsea; underwater worksite.
Summary
A subsea thermal tunnel would not sink because the manufacturer’s buoyancy calculations were incorrect.