Safety Flash

Near-miss: Unauthorised release of shore-controlled mooring lines

IMCAInternational Marine Contractors AssociationIMCA SF 13/14

Near-miss: Unauthorised release of shore-controlled mooring lines

Read at IMCAOpens the publisher’s page on imca-int.com

Summary

During departure preparations at a shipyard, shore personnel released four wire mooring ropes without bridge permission before tugs were positioned. The master’s prompt action maintained control, with no injury or damage. The flash examines delayed communication and recommends change management, agreed radio protocols and advance assurance of third-party personnel’s qualifications and training.

Topics

About This Record
Publisher
International Marine Contractors Association
Type
Safety Flash
Reference
IMCA SF 13/14
Date
17 July 2014
Topic
Human Factors
Activity
Mooring Operations
Equipment
Mooring Lines, Wire Rope
Control
Competence and Training, Management of Change, Safety Communication
Sector
Marine Industry
Setting
Vessel
Link
Checked , working
Record
imca-sf-13-14-near-miss-unauthorised-release-of-shore-controlled-mooring-lines · added 1 September 2026

Report a problem with this record