Safety Flash

USCG: bollard failures at marine facilities

IMCAInternational Marine Contractors AssociationIMCA SF 15/18

USCG: bollard failures at marine facilities

Read at IMCAOpens the publisher’s page on imca-int.com

Summary

This flash summarises USCG reports of shoreside bollard failures that left moored vessels adrift, sometimes damaging vessels and shore structures without injuries or deaths. Issues included rotted pilings, possible pre-existing fractures and deteriorated bollard bases. USCG strongly recommended routine inspections and advised vessel personnel to report apparent deficiencies.

Topics

About This Record
Publisher
International Marine Contractors Association
Type
Safety Flash
Reference
IMCA SF 15/18
Date
20 July 2018
Topic
Loss of Station Keeping, Structural and Asset Integrity
Activity
Inspection and Maintenance, Mooring Operations
Equipment
Mooring Fittings
Sector
Marine Industry
Link
Checked , working
Record
imca-sf-15-18-uscg-bollard-failures-at-marine-facilities · added 1 September 2026

Report a problem with this record