Safety Flash

Near-miss: ROV fuse bolt failure

IMCAInternational Marine Contractors AssociationIMCA SF 16/09

Near-miss: ROV fuse bolt failure

Read at IMCAOpens the publisher’s page on imca-int.com

Summary

An ROV manipulator fuse bolt ejected its head during pre-dive testing, narrowly missing a technician without injury. Investigation linked the failure to damage sustained during heavy work on the previous dive. The flash recommends manual jaw operation before energising hydraulics, directing arms away from people and assets, and controlling access during deck checks.

Topics

About This Record
Publisher
International Marine Contractors Association
Type
Safety Flash
Reference
IMCA SF 16/09
Date
10 November 2009
Topic
Line of Fire, Mechanical Failure
Activity
Inspection and Maintenance, ROV Operations
Equipment
Remotely Operated Vehicle
Control
Exclusion Zones, Functional Testing, Operating and Work Procedures, Pre-Use Checks
Link
Checked , working
Record
imca-sf-16-09-near-miss-rov-fuse-bolt-failure · added 1 September 2026

Report a problem with this record