High potential near-miss: Damage to small boat during offshore survey operations

IMCAInternational Marine Contractors AssociationIMCA SF 16/16

High potential near-miss: Damage to small boat during offshore survey operations

Read at IMCAOpens the publisher’s page on imca-int.com

Summary

A small survey boat suffered partial foredeck detachment during offshore transit after a following wave overtook it. Investigation identified insufficient hull-to-foredeck bonding during construction. The crew implemented emergency arrangements and diverted to port. Actions addressed construction quality control, routine bonding inspections, structural repairs and verification of surveyor competence.

Topics

About This Record
Publisher
International Marine Contractors Association
Type
Safety Flash
Reference
IMCA SF 16/16
Date
27 June 2016
Topic
Structural and Asset Integrity, Vessel Flooding and Foundering
Activity
Inspection and Maintenance, Marine Operations
Control
Competence and Training, Emergency Response, Preventive Maintenance
Sector
Marine Industry
Setting
Vessel
Link
Checked , working
Record
imca-sf-16-16-high-potential-near-miss-damage-to-small-boat-during-offshore-survey-operations · added 1 September 2026

Report a problem with this record