Safety Flash
MSF: Engine damage after routine maintenance
Read at IMCAOpens the publisher’s page on imca-int.com
Summary
An offshore platform supply vessel stopped an engine following a high-temperature alarm. Inspection found valve-gear damage, 86 running hours after valve adjustments. Evidence indicated a loose adjusting-screw locking nut, most likely insufficiently tightened during reassembly. Lessons emphasise manufacturer requirements, careful reassembly checks and torque-wrench verification.