Safety Flash

Near miss with high pressure gas due to incorrect procedures

IMCAInternational Marine Contractors AssociationIMCA SF 19/23

Near miss with high pressure gas due to incorrect procedures

Read at IMCAOpens the publisher’s page on imca-int.com

Summary

A crew preparing to pig high-pressure gas mains questioned a valve closure and identified that it would block the intended downstream flow. Work stopped and valves were restored to normal. Review found instructions based on an obsolete drawing; operations remained suspended pending correction, avoiding a compressor trip and possible downstream supply problems.

Topics

About This Record
Publisher
International Marine Contractors Association
Type
Safety Flash
Reference
IMCA SF 19/23
Date
3 August 2023
Topic
Pressure Systems
Equipment
Process Pipework and Pipelines, Valve
Control
Operating and Work Procedures, Safety Communication, Stop-Work Authority
Link
Checked , working
Record
imca-sf-19-23-near-miss-with-high-pressure-gas-due-to-incorrect-procedures · added 1 September 2026

Report a problem with this record